June 11: The "before" shot.

|
June 11: Digging out to the dirt for the foundation.

|
June 13: The foundation slab in.

|
June 13: The form made up for the countertop.

|
June 14: Block going in.

|
June 14: More shots of the block being installed.

|
June 14: Block and the adjusted gas line.

|
June 16: Test fitting the counterop on the block base.

|
June 17: Stone veneer finished and testing the fits.

|
June 17: Test fitting the grill in the base.

|
June 17: The flagstone back installed.

|
June 17: Another view of the flagstone and finished stone.

|
September 11: A totally finished
grill including the side burner.

|
September 11: Both lids open.

|
September 11: Detail of the finger notch to open the burner
cover.

|
September 11: Finished grill with a larger view.

|
|
|